RH
Infrastructure · Project Knowledge

Doha Infrastructure Program

Doha, Qatar · Ashghal — Public Works Authority
Client
Ashghal — Public Works Authority
Country
Qatar
Coordinates
25.2854 N, 51.5310 E
Project dates
Jun 2015 – Aug 2020
Project manager
M. Al-Sayed
Disciplines
HighwaysDrainageWaterHydrology

Project description

City-wide roads, surface water drainage and foul network program including hydrological modelling of 42 catchments and coastal outfall design.

Shoreline protection across 14 km of exposed frontage
Stormwater catchment remodelling after the 2021 rainfall event
412 boreholes over reclaimed and natural ground
Integrated public realm and utility corridor design

Key insights generated from historical data

Derived from the governed knowledge base

  • Drainage surcharge patterns here match 6 coastal projects across the Gulf and Red Sea.
  • Foundation solutions on reclaimed ground reused from Abu Dhabi Airport Development reduced design iteration by an estimated 4 weeks.
  • Shoreline erosion rates are 2.1× the regional median, informing the revetment design life.

Project boundary

-20°-10°10°20°30°40°50°60°70°-10°10°20°30°40°50°60°Doha Infrastructure Program
EPSG:4326Schematic basemap · PostGIS geometries

Data completeness

Catalogued assets91%
Coordinate metadata88%
Classification assigned97%
Embedded for semantic search83%

Related projects

Matched on discipline and geography