Water · Project Knowledge
NEOM Water Transmission Corridor
Tabuk, Saudi Arabia · NEOM Utilities
Client
NEOM Utilities
Country
Saudi Arabia
Coordinates
28.0000 N, 35.3000 E
Project dates
Sep 2021 – Jul 2023
Project manager
L. Idrissi
Disciplines
WaterHydrologyGeotechnical
Project description
180 km transmission main, pumping stations and wadi crossings with flood risk assessment across arid catchments.
Shoreline protection across 14 km of exposed frontage
Stormwater catchment remodelling after the 2021 rainfall event
412 boreholes over reclaimed and natural ground
Integrated public realm and utility corridor design
Key insights generated from historical data
Derived from the governed knowledge base
- Drainage surcharge patterns here match 6 coastal projects across the Gulf and Red Sea.
- Foundation solutions on reclaimed ground reused from Abu Dhabi Airport Development reduced design iteration by an estimated 4 weeks.
- Shoreline erosion rates are 2.1× the regional median, informing the revetment design life.
Project boundary
EPSG:4326Schematic basemap · PostGIS geometries
Data completeness
Catalogued assets85%
Coordinate metadata88%
Classification assigned97%
Embedded for semantic search83%
Related projects